top of page
Team Rangrove
Writer
More actions
Profile
Join date: Mar 22, 2026
Posts (24)
Apr 10, 2026 ∙ 2 min
BRO Plans Multi-Cell Box Culvert Bridge Over Kheerganga in Dharali to Prevent Flood Damage
BRO is set to construct a multi-cell box culvert bridge over the Kheerganga river in Dharali, Uttarkashi, after last year's devastating flood buried the Gangotri Highway under 25 feet of debris. A site inspection and land acquisition survey have already been initiated.
1
0
Apr 10, 2026 ∙ 2 min
Uttarakhand Conducts Mock Drills Across 7 Districts in Preparation for Chardham Yatra
Uttarakhand conducted mock drills across 7 districts ahead of the Chardham Yatra season, with the State Emergency Operations Centre monitoring exercises as officials aim for zero loss of life during the pilgrimage.
1
0
Apr 10, 2026 ∙ 2 min
Dollar Surge Makes Solar Projects Costlier in Uttarakhand, Regulator Proposes New Tariff Rates
The rupee's depreciation against the US dollar has increased solar project costs in Uttarakhand for 2026-27, even as the Electricity Regulatory Commission has proposed reduced electricity tariff rates for solar PV, canal-based solar, and battery storage systems.
1
0
bottom of page
